Standard |
RENOVATE COMMERCIAL BUILDING |
2021-02-12 |
Open |
$1,025,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2020-08-18 |
Open |
$110,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2020-04-28 |
Closed |
$70,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2020-02-03 |
Stop Work |
$600,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-11-15 |
Stop Work |
$41,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-09-23 |
Stop Work |
$40,000 |
BUILDFINAL |
|
Standard |
OCCUPANCY |
2019-09-06 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-05-24 |
Open |
$185,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-02-26 |
Open |
$55,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-02-20 |
Open |
$89,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2019-01-07 |
Open |
$956,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-11-28 |
Stop Work |
$350,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-11-09 |
Open |
$175,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-10-25 |
Stop Work |
$71,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-10-18 |
Open |
$77,580 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2018-09-17 |
Stop Work |
$12,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-09-10 |
Stop Work |
$280,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-08-03 |
Stop Work |
$127,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-05-11 |
Stop Work |
$2,000,000 |
BUILDFINAL |
|
Standard |
OCCUPANCY |
2018-05-07 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
CONSTRUCT ACCESSORY BLDG - ICI |
2018-04-30 |
Open |
$180,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-03-09 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-03-05 |
Stop Work |
$10,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-02-28 |
Open |
$8,000 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2018-02-26 |
Stop Work |
$6,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-02-13 |
Stop Work |
$400,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2018-01-03 |
Stop Work |
$382,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2017-11-30 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
OCCUPANCY |
2017-11-23 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2017-10-19 |
Stop Work |
$13,400 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2017-10-02 |
Stop Work |
$1,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2017-08-31 |
Open |
$480,000 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2017-06-13 |
Stop Work |
$3,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2017-05-29 |
Stop Work |
$75,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2017-05-02 |
Stop Work |
$58,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2017-03-27 |
Stop Work |
$250,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2017-02-01 |
Stop Work |
$15,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2017-01-26 |
Stop Work |
$680,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-12-28 |
Stop Work |
$80,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-12-20 |
Stop Work |
$45,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-11-07 |
Open |
$40,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-09-20 |
Stop Work |
$74,250 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-09-19 |
Stop Work |
$85,000 |
BUILDFINAL |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2016-08-22 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-08-22 |
Open |
$18,250 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-08-19 |
Stop Work |
$35,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-08-05 |
Stop Work |
$125,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-07-25 |
Stop Work |
$600,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-07-20 |
Stop Work |
$700,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-07-08 |
Stop Work |
$158,300 |
N/A |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2016-06-17 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2016-06-13 |
Stop Work |
$28,600 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2016-04-13 |
Stop Work |
$40,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-04-12 |
Open |
$28,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-04-08 |
Stop Work |
$109,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2016-02-04 |
Stop Work |
$10,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-12-14 |
Stop Work |
$14,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-10-16 |
Stop Work |
$57,000 |
BUILDFINAL |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2015-10-07 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2015-10-07 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2015-10-05 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
ADD TO COMMERCIAL BUILDING |
2015-09-24 |
Stop Work |
$6,500,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-09-22 |
Stop Work |
$1,585,028 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-09-04 |
Stop Work |
$90,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-09-03 |
Stop Work |
$200,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2015-06-23 |
Open |
$384,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-11-06 |
Stop Work |
$1,200,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-10-27 |
Stop Work |
$6,000 |
ROUGH IN |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-10-17 |
Stop Work |
$61,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-09-26 |
Stop Work |
$125,000 |
ROUGH IN |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-09-26 |
Open |
$45,000 |
ROUGH IN |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-09-26 |
Stop Work |
$285,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-09-03 |
Stop Work |
$77,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-07-22 |
Stop Work |
$80,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-07-18 |
Stop Work |
$15,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-06-24 |
Stop Work |
$90,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-06-13 |
Stop Work |
$70,000 |
BUILDFINAL |
|
Standard |
INSTALL PROJECTING SIGN |
2014-06-11 |
Stop Work |
$6,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-06-04 |
Stop Work |
$22,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-06-04 |
Stop Work |
$40,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-03-21 |
Open |
$24,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2014-01-20 |
Stop Work |
$72,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-11-22 |
Stop Work |
$39,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-11-20 |
Stop Work |
$321,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-11-13 |
Stop Work |
$400,000 |
BUILDFINAL |
|
Standard |
CONSTRUCT ACCESSORY BLDG - ICI |
2013-11-08 |
Stop Work |
$50,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-08-01 |
Stop Work |
$19,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-07-22 |
Stop Work |
$1,500,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-07-16 |
Open |
$5,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-07-09 |
Stop Work |
$15,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-07-08 |
Stop Work |
$630,000 |
BUILDFINAL |
|
Standard |
OCCUPANCY |
2013-05-21 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-05-10 |
Stop Work |
$3,500,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2013-03-19 |
Stop Work |
$28,890 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-12-12 |
Stop Work |
$190,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-11-26 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-11-16 |
Open |
$45,000 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2012-10-26 |
Stop Work |
$15,570 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2012-10-18 |
Stop Work |
$40,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-10-17 |
Open |
$186,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-08-30 |
Stop Work |
$737,000 |
PLUMBFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-08-01 |
Stop Work |
$26,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-05-31 |
Stop Work |
$380,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-05-31 |
Stop Work |
$230,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-05-03 |
Stop Work |
$11,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-04-25 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-03-14 |
Open |
$29,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-02-24 |
Stop Work |
$85,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-02-15 |
Stop Work |
$179,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2012-01-10 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-12-13 |
Stop Work |
$35,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-12-12 |
Stop Work |
$6,500,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-12-01 |
Stop Work |
$150,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-10-07 |
Stop Work |
$250,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-08-17 |
Stop Work |
$99,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-08-08 |
Stop Work |
$130,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-08-05 |
Stop Work |
$700,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-07-15 |
Stop Work |
$180,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-05-16 |
Stop Work |
$65,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-04-21 |
Stop Work |
$280,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-03-15 |
Stop Work |
$80,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-03-11 |
Stop Work |
$350,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-02-02 |
Stop Work |
$700,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-01-19 |
Stop Work |
$150,000 |
ROUGH IN |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2011-01-11 |
Stop Work |
$40,000 |
BUILDFINAL |
|
Standard |
ENCROACHMENT ON PUBLIC ROW |
2010-10-27 |
Stop Work |
N/A |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-10-22 |
Stop Work |
$5,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-09-30 |
Stop Work |
$175,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-09-17 |
Stop Work |
$60,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-07-20 |
Stop Work |
$75,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-07-08 |
Stop Work |
$52,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-04-14 |
Stop Work |
$73,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-03-08 |
Open |
$24,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2010-01-22 |
Stop Work |
$19,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2009-11-30 |
Stop Work |
$6,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2009-10-20 |
Open |
$736,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2009-09-03 |
Stop Work |
$35,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2009-08-19 |
Stop Work |
$30,000 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2009-06-30 |
Stop Work |
$7,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2009-06-19 |
Stop Work |
$19,750 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2009-05-01 |
Stop Work |
$20,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-12-03 |
Stop Work |
$250,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-11-05 |
Stop Work |
$680,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-06-03 |
Stop Work |
$17,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-03-04 |
Stop Work |
$90,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-02-11 |
Stop Work |
$122,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-02-05 |
Stop Work |
$20,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-02-01 |
Stop Work |
$58,750 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-01-08 |
Stop Work |
$248,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2008-01-02 |
Stop Work |
$15,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-12-10 |
Stop Work |
$4,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-10-11 |
Stop Work |
$10,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-10-10 |
Stop Work |
$15,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-07-11 |
Stop Work |
$12,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-07-04 |
Stop Work |
$160,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-06-22 |
Stop Work |
$69,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-06-22 |
Stop Work |
$50,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-06-04 |
Stop Work |
$40,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-05-24 |
Stop Work |
$327,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-05-23 |
Stop Work |
$50,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-05-02 |
Stop Work |
$12,200 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2007-03-23 |
Stop Work |
$2,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-02-28 |
Stop Work |
$125,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2007-01-02 |
Stop Work |
$15,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-12-08 |
Stop Work |
$607,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-11-09 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-11-03 |
Stop Work |
$32,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-11-03 |
Stop Work |
$35,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-11-03 |
Stop Work |
$20,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2006-11-03 |
Stop Work |
$2,800 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-10-27 |
Stop Work |
$10,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-10-27 |
Stop Work |
$250,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-10-10 |
Stop Work |
$22,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2006-10-02 |
Stop Work |
$7,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-09-15 |
Stop Work |
$180,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-06-20 |
Stop Work |
$12,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-06-06 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-05-17 |
Stop Work |
$299,776 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-04-26 |
Stop Work |
$220,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-04-25 |
Stop Work |
$135,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-04-19 |
Stop Work |
$500,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-04-12 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-04-04 |
Stop Work |
$40,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-03-28 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2006-02-28 |
Stop Work |
$12,200 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-01-31 |
Stop Work |
$36,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-01-26 |
Stop Work |
$30,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-01-19 |
Stop Work |
$50,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-01-10 |
Stop Work |
$125,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2006-01-09 |
Stop Work |
$12,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-12-14 |
Stop Work |
$28,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-11-07 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-10-04 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-09-09 |
Stop Work |
$240,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-08-26 |
Stop Work |
$145,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-08-15 |
Stop Work |
$300,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-07-06 |
Stop Work |
$16,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-03-23 |
Stop Work |
$380,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2005-02-01 |
Stop Work |
$140,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-11-09 |
Stop Work |
$2,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-11-01 |
Stop Work |
$20,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-10-19 |
Stop Work |
$250,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-07-16 |
Stop Work |
$100,000 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-05-07 |
Stop Work |
$48,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2004-03-15 |
Stop Work |
$143,000 |
BUILDFINAL |
|
Standard |
INSTALL FASCIA SIGN |
2004-01-06 |
Stop Work |
$2,500 |
N/A |
|
Standard |
INSTALL FASCIA SIGN |
2004-01-06 |
Stop Work |
$2,500 |
N/A |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-11-05 |
Stop Work |
$100,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-11-03 |
Stop Work |
$10,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-10-23 |
Stop Work |
$52,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-10-06 |
Stop Work |
$48,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-10-06 |
Stop Work |
$7,000 |
N/A |
|
Standard |
OCCUPANCY |
2003-09-17 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-07-29 |
Stop Work |
$600,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-07-29 |
Stop Work |
$6,500 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-07-28 |
Stop Work |
$452,000 |
BUILDFINAL |
|
Standard |
OCCUPANCY |
2003-07-16 |
Stop Work |
N/A |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-06-18 |
Stop Work |
$96,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-06-12 |
Stop Work |
$80,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-06-02 |
Stop Work |
$25,000 |
BUILDFINAL |
|
Standard |
RENOVATE COMMERCIAL BUILDING |
2003-06-02 |
Stop Work |
$150,000 |
BUILDFINAL |